Posts Tagged ‘lithium-ion battery’

 Exactly three years since the day the Chevrolet Volt concept car debuted, GM today manufactured the first advanced lithium-ion battery for a mass-marketed electric vehicle at GM’s Brownstown Battery Pack Assembly Plant.

 “This is an important milestone for GM – and a critical step in bringing the Chevrolet Volt to market,” said GM Chairman and CEO Ed Whitacre.

GM announced last August a $43-million investment to prepare the 160,000-square-foot, landfill-free facility for production of lithium-ion battery packs for the Volt and other electric vehicles with extended-range capabilities. The plant is part of a wholly-owned subsidiary of General Motors called GM Subsystems Manufacturing LLC.

In just five months, the Brownstown plant was converted from an empty facility to a production-ready battery manufacturing site. New machinery and specialized equipment have been installed and three primary assembly areas have been completed: battery module pre-assembly, final assembly and the battery pack main line.

The Volt’s battery pack is made up of multiple linked battery modules and more than 200 battery cells. The initial assembly area is where the prismatic-shaped cells are processed and installed by state-of-the-art flexible automated equipment into modules, which are then delivered to the battery pack main line.

The battery pack main line area features an Automated Guided Cart (ACG) system that includes operations for thermal and electrical assembly, along with quality and dimensional checks. The main line is also where battery pack final testing, verification and packaging for shipment take place.  

Initial battery production at Brownstown will be used to validate the plant’s equipment and processes, and batteries will be sent to GM’s Global Battery Systems lab in Warren, Mich., for testing. This spring, GM will begin shipping batteries to GM’s Detroit-Hamtramck plant, the assembly location for the Volt, for use in production validation vehicles.

Regular production at Brownstown and Detroit-Hamtramck is set to begin in the fourth quarter.

GM is investing $700 million in eight Michigan facilities for Volt-related production, including $336 million in the Detroit-Hamtramck plant, which will benefit from battery research conducted at the battery lab in Warren; receive batteries from Brownstown; use tooling from Grand Blanc; take delivery of camshafts and connecting rods from Bay City; and dies, stampings and the Volt’s 1.4L engine-generator from three plants in Flint.

“The development of electric vehicles like the Chevy Volt is creating entire new sectors in the auto industry – an ‘ecosystem’ of battery developers and recyclers, builders of home and commercial charging stations, electric motor suppliers and much more,” Whitacre said. “These companies and universities are creating new jobs in Michigan and across the U.S. – green jobs – and they’re doing it by developing new technology, establishing new manufacturing capability, and strengthening America’s long-term competitiveness.”

In August, the U.S. Dept. of Energy selected 45 companies, universities and organizations, including GM, in 28 states for more than $2 billion in awards for electric drive and battery manufacturing and transportation electrification. Nearly half of that total is designated for cell, battery and materials manufacturing facilities in Michigan.

The Volt is an electric vehicle with extended-range capability. It is designed to drive up to 40 miles on electricity without using gasoline or producing tailpipe emissions. When the Volt’s lithium-ion battery is depleted of energy, a flex-fuel engine-generator seamlessly operates to extend the total driving range to about 300 miles before refueling or stopping to recharge the battery. Pricing has not been announced.

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • NewsVine
  • Reddit
  • StumbleUpon
  • Google Bookmarks
  • Yahoo! Buzz
  • Twitter
  • Technorati
  • Live
  • LinkedIn
  • MySpace
YouTube Preview Image

Nissan will start taking online reservations for the Leaf in April. Better get in line now; some 50,000 people have already signed up!

Nissan LEAF, the world’s first all-electric, zero-emission car designed for the mass market, and leads up to the start of the vehicle-purchase process. The Nissan LEAF will be available to consumers via lease or sale, in a single transaction that includes the battery. Steps to acquiring a Nissan LEAF are:

REGISTER: Interested people can register for more information about the Nissan LEAF on www.NissanUSA.com. To date, close to 50,000 people have registered on the website. Registrants will be given first priority to reserve a Nissan LEAF.

RESERVE: The reservation process will begin in April, shortly after the announcement of the price of the Nissan LEAF. Upon paying a fully refundable $100 reservation fee, registrants will be among the first in line able to order a Nissan LEAF.

ORDER: Nissan will begin taking firm orders in August, for deliveries when sales begin in the driver’s particular market.

EARLY DELIVERIES: Rollout begins in select markets in December 2010, with vehicles available in all major launch markets quickly thereafter.

“The Nissan LEAF purchase process is effortless, transparent and accessible, offering value with a one-stop-shop approach for everything related to the car, including the assessment, permitting and installation of in-home battery charging units,” said Carlos Tavares, Chairman, Nissan Americas. “We want everyone to feel good about having a car that is affordable, fun to drive and good for the environment.”

Coinciding with this next phase of the Nissan LEAF launch is the debut of Nissan’s initial global marketing campaign, which is called “The New Car.” A first look at the campaign – which illustrates Nissan’s passion about the potential for zero-emission mobility and a better, cleaner world – was shown in New York as part of the culmination of the Nissan LEAF Zero-Emission Tour.

The Nissan LEAF Zero-Emission Tour covered 10,000 miles in the United States and Canada, providing the first opportunity for more than 100,000 people to see and learn about the Nissan LEAF first hand.

“There was a groundswell of grassroots support from coast to coast,” said Tavares. “Everywhere we went, people recognized a new form of mobility – a turning point – and they wanted to be a part of it. The response was spontaneous and diverse. We were joined by mayors and government officials, CEOs, utility partners, car enthusiasts, students, dealers, media, environmentalists, Twitter users and lots of families.”

Tour Highlights:
Diverse tour stops, stretching from Stanford University to the Kennedy Space Center. Other stops included: Phoenix on New Year’s Eve, in conjunction with the Fiesta Bowl; Qwest Field in Seattle; the Oregon Museum of Science and Industry in Portland; and a charging-station-equipped McDonald’s in Cary, N.C. The tour also stopped at Nissan Americas in Franklin, Tenn; the Smyrna, Tenn., manufacturing facility where the Nissan LEAF will be built starting in 2012; and Nissan Design Americas in San Diego. New York area stops include Madison Square Garden (Feb. 10), and upcoming public displays at the Time Warner Center (Feb. 12) and the Liberty Science Center (Feb. 13).

Due to the high level of interest, Atlanta and Boston were added to the original tour schedule, bringing total cities to 24.

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • NewsVine
  • Reddit
  • StumbleUpon
  • Google Bookmarks
  • Yahoo! Buzz
  • Twitter
  • Technorati
  • Live
  • LinkedIn
  • MySpace