Posts Tagged ‘green technology’

 Exactly three years since the day the Chevrolet Volt concept car debuted, GM today manufactured the first advanced lithium-ion battery for a mass-marketed electric vehicle at GM’s Brownstown Battery Pack Assembly Plant.

 “This is an important milestone for GM – and a critical step in bringing the Chevrolet Volt to market,” said GM Chairman and CEO Ed Whitacre.

GM announced last August a $43-million investment to prepare the 160,000-square-foot, landfill-free facility for production of lithium-ion battery packs for the Volt and other electric vehicles with extended-range capabilities. The plant is part of a wholly-owned subsidiary of General Motors called GM Subsystems Manufacturing LLC.

In just five months, the Brownstown plant was converted from an empty facility to a production-ready battery manufacturing site. New machinery and specialized equipment have been installed and three primary assembly areas have been completed: battery module pre-assembly, final assembly and the battery pack main line.

The Volt’s battery pack is made up of multiple linked battery modules and more than 200 battery cells. The initial assembly area is where the prismatic-shaped cells are processed and installed by state-of-the-art flexible automated equipment into modules, which are then delivered to the battery pack main line.

The battery pack main line area features an Automated Guided Cart (ACG) system that includes operations for thermal and electrical assembly, along with quality and dimensional checks. The main line is also where battery pack final testing, verification and packaging for shipment take place.  

Initial battery production at Brownstown will be used to validate the plant’s equipment and processes, and batteries will be sent to GM’s Global Battery Systems lab in Warren, Mich., for testing. This spring, GM will begin shipping batteries to GM’s Detroit-Hamtramck plant, the assembly location for the Volt, for use in production validation vehicles.

Regular production at Brownstown and Detroit-Hamtramck is set to begin in the fourth quarter.

GM is investing $700 million in eight Michigan facilities for Volt-related production, including $336 million in the Detroit-Hamtramck plant, which will benefit from battery research conducted at the battery lab in Warren; receive batteries from Brownstown; use tooling from Grand Blanc; take delivery of camshafts and connecting rods from Bay City; and dies, stampings and the Volt’s 1.4L engine-generator from three plants in Flint.

“The development of electric vehicles like the Chevy Volt is creating entire new sectors in the auto industry – an ‘ecosystem’ of battery developers and recyclers, builders of home and commercial charging stations, electric motor suppliers and much more,” Whitacre said. “These companies and universities are creating new jobs in Michigan and across the U.S. – green jobs – and they’re doing it by developing new technology, establishing new manufacturing capability, and strengthening America’s long-term competitiveness.”

In August, the U.S. Dept. of Energy selected 45 companies, universities and organizations, including GM, in 28 states for more than $2 billion in awards for electric drive and battery manufacturing and transportation electrification. Nearly half of that total is designated for cell, battery and materials manufacturing facilities in Michigan.

The Volt is an electric vehicle with extended-range capability. It is designed to drive up to 40 miles on electricity without using gasoline or producing tailpipe emissions. When the Volt’s lithium-ion battery is depleted of energy, a flex-fuel engine-generator seamlessly operates to extend the total driving range to about 300 miles before refueling or stopping to recharge the battery. Pricing has not been announced.

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • NewsVine
  • Reddit
  • StumbleUpon
  • Google Bookmarks
  • Yahoo! Buzz
  • Twitter
  • Technorati
  • Live
  • LinkedIn
  • MySpace
PHOENIX, Jan 28, 2010 — BUSINESS WIRE

U.S. Department of Energy Secretary Steven Chu today recognized ECOtality, Inc. (OTCBB: ETLE), and its wholly owned subsidiary, eTec (Electric Engineering Transportation Corporation), for the company’s work toward establishing robust electric vehicle charging infrastructure in the United States. Secretary Chu made his remarks at the Washington Auto Show in Washington, D.C. today during a news conference to announce financing that will enhance U.S. electric vehicle manufacturing.

“eTec is working on the largest EV infrastructure deployment in the world, and we are working very closely to get EVs on the road,” said Secretary Chu. “We need charging stations and infrastructure – it is very important.”

Secretary Chu announced that the Department of Energy has closed a $1.4 billion loan agreement with Nissan North America, Inc. The loan will support the modification of Nissan’s Smyrna, Tenn., manufacturing plant to produce the Nissan LEAF, a zero-emission, all-electric vehicle, and the lithium-ion battery packs to power them.

In August 2009, ECOtality’s subsidiary, eTec, was awarded a federal stimulus grant of nearly $100 million from the U.S. Department of Energy (DOE). The grant is funded through the American Recovery and Reinvestment Act (ARRA), with the goal of creating thousands of new jobs, preserving existing jobs and jump-starting the economy.

The $100 million DOE grant is facilitating The EV Project, the largest rollout of electric vehicle infrastructure in the United States. With a match from project partners, The EV Project has a total value of more than $200 million, and will support electric vehicles with home-base, commercial and public chargers in major markets in five states: Arizona (Phoenix & Tucson areas), Washington (Seattle area), Oregon (Portland, Salem, Corvallis and Eugene), California (San Diego) and Tennessee.

eTec President and CEO Don Karner attended the announcement as a guest of Secretary Chu. Karner said, “The EV Project is paving the way for widespread acceptance of electric vehicles, and we are proud to be working with the Department of Energy to achieve the goal to create jobs and end our dependence on foreign oil.”

For more information about The EV Project, please visit www.theevproject.com.

About ECOtality, Inc.

ECOtality, Inc. (OTCBB:ETLE), headquartered in Scottsdale, Ariz., is a leader in clean electric transportation and storage technologies. Through innovation, acquisitions and strategic partnerships, ECOtality accelerates the market applicability of advanced electric technologies to replace carbon-based fuels. For more information about ECOtality, Inc., please visit www.ecotality.com.

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • NewsVine
  • Reddit
  • StumbleUpon
  • Google Bookmarks
  • Yahoo! Buzz
  • Twitter
  • Technorati
  • Live
  • LinkedIn
  • MySpace